
Check the cleanliness and flatness of the sub-flooring.

Clean the surface of the slab.

Clean the back of the slab.

Spread the adhesive parallel to the short slab side with a 3 mm straighttoothed trowel.

Spread the adhesive sub-flooring parallel to the short side of the slab with a 10 mm straight-toothed trowel.

Tap with a tool from the centre to the outside of the slab to compact the adhesive and remove residual air.

Bring the slabs closer together with a suitable tool.

Use levelling spacers to ensure that the slabs are level.
- Use adhesives based on the type of support or intended use.
- Provide a full bed of adhesive for proper laying.